Let there be light.

| | Comments (0)

Finished roughing in the wiring today. Whew... what a job...

500+ ft of wire, 12 120V-20A outlets, 2 125V-30A outlets, the light cans, the dimmer switches, the fan and projector wiring... And this is the result:

IMG_4859.JPG


And with the back set of lights dimmed (all can be dimmed by "bank"):

IMG_4860.JPG


Tomorrow I'm going to run speaker wire and put in the heating and A/C ducts. Then it'll be time to build the front stage (and sub/component box), then insulate and drywall.

I'm off to take a shower... I stink right now. :-)

Leave a comment